Back to Project ProfilesGreenwin Lobby Renovation

Location: 365 Bloor Street East, Toronto, ON

This prestigious project involved the comprehensive demolition and reconstruction of the lobby space at 365 Bloor Street East in recognition of the rebranding to accommodate Post Media as the new anchor tenant. Work included upgrades to the mechanical systems, structural repairs, new lighting, the complete replacement of all interior finishes, exterior recladding of the column portal, new stainless steel handrails and restoration of the granite building facade. The construction was carried out in several phases while the building, located on a busy thoroughfare, remained fully operational to the public thus requiring extensive hoarding and overhead protection of the public to perform this work.

Key People

Owner: Greenwin Inc.

Architect: Gow Hastings Architects Inc.

Principal: Brad Daniels

Project Manager: Shevonne Reid

Site Superintendent: Gareth Dalling

© Photos: Tom Arban

365 Bloor St East (19) 1000x928365 Bloor St East (09) 1000x928

365 Bloor St East (18) 667x1000365 Bloor St East (14) 1000x667